Message from QA Group

The Cambodia Rural School Project The QA School Message from QA Group   It is our great pleasure and honor to support The QA School. ‘QA’ is the abbreviation of ‘Quality Assurance’. In 1980’s and 1990’s, many huge bridges were constructed in Japan. The biggest is world longest Akashi Bridge. Akahi Bridge, completed 1998 For […]

The Cambodia Rural School Project

The QA School


Message from QA Group

 

It is our great pleasure and honor to support The QA School. ‘QA’ is the abbreviation of ‘Quality Assurance’.

In 1980’s and 1990’s, many huge bridges were constructed in Japan. The biggest is world longest Akashi Bridge.


Akahi Bridge, completed 1998

For the quality Assurance of such constructions, special inspection technique was required.

Some dozens of engineers were gathered and developed Automatic Ultra-sonic Testing technique. The technique was well matured and widely used.

 
Automatic Ultra-sonic Testing Equipment

 

The group was called ‘QA Group’. However, members became aged and going to be retired. The group was disbanded in 2003.

For the memory of the group, this school was named ‘The QA School’.

We sincerely hope this school will be the keystone of future development of this district.

Prof. Dr. K. Horikawa, Ex-leader of QA group